HuxleyZAxis
General
This page and its peers should guide you through assembling a RepRap Huxley from the TechZone kit, or from parts you have printed which are the same as the TechZone parts. It is a work in progress, and needs some help, feel free to edit this document to add comments of you your own, or contact us [here] and send us messages asking us for better clarification or details.
I am starting by posting the pictures I have, and over the next few days, I will fill in the instructions and detials (24 Dec 2010)
Thanks,
Lambert (TechZone R&D/Support/Documenter)
You can access this page and it's peers (for the other parts of the Huxley assembly from the Main Huxley page or from the TechZone Huxley Page
Contents
The Z Axis should be put in after the frame and Y axis have been squared, and trued. Information about how to do that can be found here. You should have tightened all nuts and used threadlock on them if you are going to (I recommend that you use threadlock). If you perform the following steps before squaring and trueing up the frame and Y axis, it will be in the way and will make that process more difficult.
Drive Rods
On the left is a picture of the parts used to assemble and prepare the drive rods for the Z axis. On the right is an assembled and prepared Z Drive rod
Install the X Axis onto the Z drive rods
Adding the Z Smooth bars
Aligning the Z Axis